Pre-loading
survey is carried out to assess and determine the condition of the cargo prior
to loading and to ascertain that all is adequate for ocean carriage. The main
focus of this survey is to find out any damage so that it may be rectified at
once or replaced immediately. Documentation in this phase ensures that the
terminal receives all cargo in good order and isolates, if required at some
later point in time, the possibilities of when and/or where a particular damage
may have occurred to facilitate processing of claims.
PT.
HMS Surveyor is to contact the local agent on the arrival of the vessel, upon
arrival at the Port of Loading he will meet the Master and discussed the
loading arrangement. He must also determine the quantity to be loaded, the
surface condition or mechanical damage, made a report of the damage cargo.
Other duties are as follows:
·
Check condition of cargo
·
Checking the condition of packing
and packaging
·
Quantity tally
·
Weigh of random checking
·
Monitoring to the loading operation
into transportation (containers, vessel)
·
Monitoring to lashing
·
Securing of cargo
Tidak ada komentar:
Posting Komentar